Education Bentleigh West Primary School 10 Modules •445 SQM •Double Storey •One Day Install All Projects Key Challenges Live school environment - All works had to be delivered safely while the school stayed open. Temporary fencing and a carefully placed site compound kept construction separate from students and staff, and the school kept access to a large part of its oval. Uneven site levels - The existing ground needed additional works, including a 4-metre retaining wall at the rear and two stair towers. Minimising disruption - Transport and installation had to be timed to avoid the school day, with all 10 modules delivered and installed during the school holidays. Grove has delivered a new 10-module classroom facility at Bentleigh West Primary School for the Victorian School Building Authority (VSBA), adding around 445 square metres of space for up to 100 students. Manufacturing of the 10 modules was completed in 3 months, allowing a significant portion of the construction to take place within a controlled factory environment. The building was then delivered during the school holidays to minimise the impact of major transport and installation activities on students and staff. With 316sqm of internal room space, the new facility provides additional teaching and learning capacity for the school. The project combined off-site manufacturing with carefully coordinated delivery and on-site works, with a strong focus on safety, efficiency and minimising disruption within a live school environment. All 10 modules were installed in just one day, demonstrating the efficiency of modular construction when delivering additional infrastructure within an existing school. Following installation, Grove continued with the remaining construction, external and landscaping works while the school was operational.