Education Birranga College 410 SQM •Three Modular Buildings •13 Modules •4-Week On-Site Installation All Projects Key Challenges Tight delivery timeframe - Completing three modular buildings in time for the school's opening on Day 1, Term 1. Coordinating multiple buildings - Managing the manufacturing, transport and installation of three separate facilities within a four-week on-site program. Specialist learning requirements - Delivering Home Economics, Technology and General Purpose Classroom buildings, each with different functional requirements. Site integration and accessibility - Connecting the three buildings through interlinking decks and ramps to create an accessible learning precinct. Grove delivered three new modular buildings at Birranga College as part of a new school development for the Victorian School Building Authority (VSBA), with the facilities completed in time for Day 1, Term 1. The project comprised a 4-module Home Economics building, a 4-module Technology building and a 5-module General Purpose Classroom (GPC) building, providing approximately 410 square metres of purpose-built learning space. Interlinking decks and ramps connect the three buildings, creating an accessible and integrated learning precinct. Each building was manufactured off-site in just 12 days, allowing construction to progress efficiently within Grove’s controlled factory environment. Once complete, the modules were transported to site, with installation and associated on-site works completed over four weeks. The completed development provides three connected learning facilities, bringing together general classrooms and specialist teaching spaces within a single precinct. Delivered on schedule, the buildings were ready for students and staff from the first day of the school year.